The scheme involved supplying a main sewer with a pumping station to the village of Bryn-y-Gwenin. Dwellings in the village use septic tanks that overflow into open ditches in wet conditions.

5-kilometres of 150mm pipeline were laid at a depth of 1 - 3 metres part of which passes through a golf course, this resulted in understandable anxiety from club members concerning damage , however the surface and condition of the fairway was returned to its original condition.
This scheme was brought about due to increasing environmental concerns resulting from untreated foul water overflow from 57 dwellings at Brn-y-Gwennin.


The Sewage pumping station is now complete and was commissioned within approximately 4 weeks. Del Wislocki managed the program with our alliance partners Morrison Construction.