Capability Partnering Our Staff Pipelaying Response Units Structural Schemes Contact Us Community

Schemes completed or under construction:

View operational techniques:
Pipe Bursting Road Trenching Guided Auger Boring
Directional Drilling

Main Sewer Replacement: Loughor
The collapse of the existing 52" main sewer necessitated the replacement of 450m of twin 1350mm concrete pipe.
View details

New Main Sewer Installation:
Bryn-y-Gwennin, Gwent

Septic tanks overflowing causing pollution required the completion of a new Pumping Station and mains sewers for 57 dwellings
View details
Storm Retention Chamber:
Newbridge Rd, Port Talbot

Construction of a Storm Retention Chamber to prevent the overflow spillage of foul water into rivers in storm conditions.
View details
New Sewer Pipe and site clearance: Burghill, Hereford
Total site clearance of all contaminated material. New Sewer pipe laid.
View details

Replacement Mains Water:
Ystradfellte

The scheme has resulted from the necessity to replace the existing 19” cast iron pipe laid in 1910
View details
Underground Sewage Storage Tanks:
Bryn Afon Road

Construction of overflow sewage storage tanks.
View details
Sewer upgrading:
Neath Abbey

Existing sewer s capacity unable to handle irregular heavy flows. Additional storage was installed.
View details

Pipe Bursting Techniques
Pipe Bursting plays an integral part in replacing existing pipe with the minimum trenching.
View details


Road Trenching Techniques
Using a specially designd machine road trenching can become much more time efficient and less disruptive to surroundings.
View details

Road Trenching Techniques
Horizontal guided auger boring is fast gaining a reputation as being a cost effective way of accurately installing small to medium pipework by means of trenchless technology..
View details

Road Trenching Techniques
Over the last 30 years we have seen the development of new technology to meet the increasing demand for the replacement of ageing systems.
View details